Slough to Heathrow Airport bus
Green Line 702 · Route 703 · 43 a day (Monday to Saturday)
Next buses to Heathrow Airport
Now- Monday to Saturday: first 00:00, last 23:00, 43 direct buses a day.
Scheduled times from Slough, not live tracking. Full timetable
Green Line 702 runs 43 direct buses a day from Slough to Heathrow Airport (Monday to Saturday), Saturday 43, Sunday 43, on route 703. The journey takes about 26 min, from Slough, Wellington Street. The first bus leaves at 00:00 and the last at 23:00. Updated 16 November 2026.
Timetable summary
Monday to Saturday
- First
- 00:00
- Last
- 23:00
- Buses
- 43
- Takes
- 26 min
Sunday
- First
- 00:00
- Last
- 23:00
- Buses
- 43
- Takes
- 26 min
Timetable change: Green Line 702’s timetable changes on 19 December 2026. The times below are for the current timetable.
Buses from Slough to Heathrow Airport
From Slough, Wellington Street · to Heathrow Airport, Terminal 5 · direct, no change
Monday to Saturday
24-hour clock. Scheduled times at the stops shown.
Sunday
24-hour clock. Scheduled times at the stops shown.
The route
Slough to Heathrow Airport: questions
How long does the bus from Slough to Heathrow Airport take?
About 26 min. The quickest bus takes 22 min and the slowest 34 min. Slough and Heathrow Airport are about 8 km apart in a straight line.
What time is the first bus from Slough to Heathrow Airport?
Monday to Saturday: 00:00. Sunday: 00:00.
What time is the last bus from Slough to Heathrow Airport?
Monday to Saturday: 23:00. Sunday: 23:00.
Which bus goes from Slough to Heathrow Airport?
Route 703. It goes direct, with no change.
Is there a bus from Slough to Heathrow Airport on Sundays?
Yes, 43 on a Sunday, the first at 00:00.
Where do I catch the bus in Slough?
At Slough, Wellington Street. It arrives in Heathrow Airport at Heathrow Airport, Terminal 5.
Are these live times?
No. They are the scheduled times from Green Line 702’s published timetable, refreshed 16 November 2026. A bus can run early or late, and disruptions are not shown.
Source: Green Line 702 open data (GTFS schedule for Green Line 702), used under the Open Government Licence v3.0. Refreshed 16 November 2026; the current timetable runs to 20 December 2026. Journey times are the scheduled times at the stops shown. Contains public sector information licensed under the Open Government Licence v3.0. Changes made: times reformatted into timetables and departure lists.
Town and place names: GeoNames, used under CC BY 4.0.