Read each row as the hour, then the minutes past it: 07 then 05 35 means 07:05 and 07:35. A "+" after the hour marks trips after midnight that belong to the day before. Scheduled times from Arriva North East’s published timetable data, refreshed 16 November 2026. Not live arrivals.
About this stop
James Cook Hospital North is a bus stop on the Arriva North East network (stop mbrgjat), served by Route 63 to Regent Walk Shopping Centre, Route 28A to High Street, Route 29 to Cedar Road, Route 28 to Methodist Church, Route 28B to High Street, Route 29A to Cedar Road. On weekdays the first bus leaves at 06:28 and the last at 23:56.
For a school, club, café or community site near this stop: paste this code into your page and it shows the next buses here, worked out again every 30 seconds. Free, no sign-up, with a link back.
Questions about James Cook Hospital North
Which buses stop at James Cook Hospital North?
Route 63 to Regent Walk Shopping Centre, Route 28A to High Street, Route 29 to Cedar Road, Route 28 to Methodist Church, Route 28B to High Street, Route 29A to Cedar Road stop at James Cook Hospital North (stop mbrgjat) in Arriva North East.
When is the first and last bus at James Cook Hospital North?
Monday: first bus 06:28, last 23:56 (107 buses). Saturday: first bus 07:14, last 23:56 (101 buses). Sunday: first bus 07:24, last 23:26 (49 buses). Public holiday timetables can differ; each route page lists them.
How often do buses come to James Cook Hospital North?
On a Monday about 7 buses an hour stop here between 07:00 and 19:00 (88 in those twelve hours, all routes together).
What other stops are near James Cook Hospital North?
The closest are James Cook Hospital South (mbrawdj, about 1 min walk), Premier Inn (mbrgjag, about 1 min walk), Premier Inn (mbrgjaj, about 1 min walk).
Are these live arrival times?
No. They are the scheduled times from Arriva North East’s published timetable, refreshed 16 November 2026. A bus can run early or late, and disruptions are not shown.
Source: Arriva North East, via the Bus Open Data Service open data (GTFS schedule for Arriva North East), used under the Open Government Licence v3.0. Refreshed 16 November 2026; the current timetable runs to 20 September 2027. Contains public sector information licensed under the Open Government Licence v3.0. Changes made: times reformatted into timetables and departure lists.